Prince George, BC New Lagoon HDPE Liner and French Drain

Scope:

Supply and install new HDPE liner in existing sewage lagoon including french drain system.

Services:

  • Bypass existing lagoon cell, drain, pump, and remove sludge
  • Earthworks to regrade the existing lagoon cell in preparation of drains and liner
  • Installation of perforated drain system including vent pipes and manhole
  • Directional drill drainage pipes through existing berm
  • Supply and install HDPE liner including connections to existing piping within the lagoon